Lockdown workshop

With a day off and no where to go we dragged out the Xs frame and got chopping. Rear foot peg mounts , side panel lugs and misc studs and brackets all shaved off then tidied up the ugly lock stop (chopped it off) . Fixed the welder for phase two tomorrow although I may wait until the madness is over and I can get the frame blasted.

Leave a Reply

Your email address will not be published. Required fields are marked *